For the first six years of operation, Sid Gauby and the Slow River Coffee truck relied on an inline diesel generator to provide power to his equipment. And, he requires A LOT of electricity, thanks to his espresso machine and coffee brewer pulling 220V each. On the hunt for a better solution that was environmentally friendly and cost-effective, Sid found Joule Case.
Joule Case was able to design a battery solution for Slow River that saved money while allowing Sid to serve his customers in a cleaner, quieter, greener environment.